Single document
Addendum checklist
Upload one addendum PDF and select a trade. Review bid-date changes, acknowledgment requirements, affected sheets/specs, risks, actions, and cited snippets.
Construction bid document review
Upload an addendum PDF or compare old vs revised bid documents. AddendaLens drafts required actions, changes to review, risk flags, affected sheets/specs, and source snippets.
Drafts a first pass for estimator review. Not official bid review.
Bid date
Aug 14 · 2:00 PM
Changed
Bid form
Attachment A
Replace
Sheet / spec
E-201 · 26 09 23
Review
Source check
5 page references
Open
Product preview
The output stays close to the source: practical actions up front, affected documents grouped, and page snippets easy to inspect.
Example memo preview
Update bid calendar
Bid opening moved to August 14 at 2:00 PM.
Replace old bid form
Use Attachment A and acknowledge Addendum No. 03.
Check revised lighting scope
Review E-201 fixture tags and Section 26 09 23.
“Drawing E-201 Lighting Plan has been reissued to revise fixture tags L2 and EM1 in the community room.”
Reason: revised electrical sheet
How it works
01
Start with one addendum, or pair an old bid document with its revised issue.
02
Read required actions, bid risks, scope changes, and affected document references.
03
Verify each important finding against the issued PDF before updating the bid.
Two review modes
Single document
Upload one addendum PDF and select a trade. Review bid-date changes, acknowledgment requirements, affected sheets/specs, risks, actions, and cited snippets.
Old vs revised
Compare extracted text from old and revised bid documents. Review grouped changes with old/new page references in a document change memo.
Early beta
AddendaLens is best tested with public, old, redacted, or non-sensitive addenda. The goal is blunt estimator feedback on what helps and what still needs checking by hand.
Not official bid review.
Always verify against issued bid documents.